Hydropower and renewable energy development plans

Hydropower and renewable energy development plans (10 years so far)

1. Planning of medium and small HPPs of Ha Giang province, from 100kW – 50,000 KW (stage1)
2. Planning of medium and small HPPs of Gia Lai province, from 100kW – 30,000 KW (stage1)
3. Planning of medium and small HPPs of KonTum province, from 100kW – 30,000 KW (stage1)
4. Planning of medium and small HPPs of Dak Lak province, from 100kW – 30,000 KW
5. Planning of medium and small HPPs of Dak Nong province, from 100kW – 30,000 KW
6. Planning of medium and small HPPs of Son La province, from 100kW – 30,000 KW
7. Planning of medium and small HPPs of Gia Lai province, from 100kW – 30,000 KW (stage 2)
8. Planning of medium and small HPPs of KonTum province, from 100kW – 30,000 KW (stage 2)
9. Planning of medium and small HPPs of Lang Son province, from 100kW – 30,000 KW
10. Planning of medium and small HPPs of Cao Bang province, from 100kW – 30,000 KW
11. Planning of medium and small HPPs of Nghe An province, from 100kW – 30,000 KW
12. Planning of medium and small HPPs of Ha Giang province, from 100kW – 50,000 KW (stage 2)
13. Planning of medium and small HPPs of Dien Bien province, from 100kW – 30,000 KW
14. Planning of medium and small HPPs of Quang Binh province, from 100kW – 30,000 KW
15. Vietnam national energy development master plan
16. Strategy and master plan on renewable energy development in Vietnam for period up to 2015, with outlook to 2025
17. Wind potential planning for northern provinces and Lang Son province.
18. Development of norm rates for wind power development in Vietnam
19. Planning for renewable energy development for northern midlands for period up to 2030, outlook to 2030
20. Assessment of impacts of connection of wind farms to national power grid
21. On –grid biomass power generation projects
22. On –grid biogas power generation projects
23. Development of cost norms for national and provincial wind power development planning
24. Consulting services for power generation system using redundant heat
25. Verify technical design, total cost estimates of solar power project of Quang Binh province
26. RE development planning of Thanh Hoa province up to 2020 with outlook to 2025
27. Survey, collect and supply data on rural electrification in Vietnam
28. Grid-connected power generation from waste
29. Support to develop solar power in Vietnam – sponsored and implemented by Spain

Facebook
Twitter
LinkedIn