Power development plans for the period 2006-2010
1. Master plan on national power development VI for period 2005- 2015 with outlook to 2025 2. Master plans on
1. Master plan on national power development VI for period 2005- 2015 with outlook to 2025 2. Master plans on
1. National power development master plan for the period 2010-2020 with outlook to 2030 (Master Plan VII) 2. 500-220-110 power
Thermal power and nuclear power projects (10 years so far) 1. Feasibility report of the first nuclear power plant in
1.SEA of National power development master plan for the period 2011-2020 with outlook to 2030 (PDP VII) 2. EIA of
Hydropower and renewable energy development plans (10 years so far) 1. Planning of medium and small HPPs of Ha Giang
Power transmission line and substation design projects (10 years so far) I. Design projects (FS+design) 1. Technical and construction design